Hasharon Prison – Tel-Mond
A maximum security detention facility built with the concept of improving the inmates’ conditions. The building complex houses about 640 inmates in four detention structures. Each structure contains two wings, in every wing forty cells. Each cell inhabits two inmates a fixed toilet facility.
The central administration block has an intake and release section, a clinic and hospitalization rooms, a visiting section, central kitchen, administration, staff residence and an education center.
Gross area: 17,500 sq.m
Cost: 23,000,000$
Completion date: 1999
Client: The Prison Authority.
Fully operational: 2001
A maximum security detention facility built with the concept of improving the inmates’ conditions. The building complex houses about 640 inmates in four detention structures. Each structure contains two wings, in every wing forty cells. Each cell inhabits two inmates a fixed toilet facility.
The central administration block has an intake and release section, a clinic and hospitalization rooms, a visiting section, central kitchen, administration, staff residence and an education center.
Gross area: 17,500 sq.m
Cost: 23,000,000$
Completion date: 1999
Client: The Prison Authority.
Fully operational: 2001